Industrial refrigeration / Since 1986
Cold,
Ammonia pumps, compressor packs, air coolers and complete cold stores, all in one catalogue with photos, datasheets and manuals. Supplying refrigeration in Iran and abroad since 1986.
Ammonia (NH₃) plants · CO₂ transcritical · Freon systems · Cold stores · Blast freezers · IQF tunnels · Process chillers · 24/7 service
25 items · 8 categories
Catalogue
Everything we supply, from ammonia pumps to complete cold stores. Open any item for its photos, datasheets and manuals.






About us
Bahman opened in 1986 in Tehran’s refrigeration bazaar on Hedayat Street. For more than forty years we have designed and built cold stores in every province of Iran, and today we work mostly as consultants to the food industry.
We are the firm that takes the empty site from the client and hands back a working cold store: our engineers and technicians design and build the steel hall, fit the insulated panels, install the plant, start it up and maintain it.

Industries
Every product keeps at its own temperature. We have built for all of them.
Selected projects
Cold stores from 100 to 20,000 tonnes for dairies, slaughterhouses, fisheries and farm co-ops in every province.

Urmia · 2024 · Fruit & vegetables
Urmia cold-storage complex
A 12,000-tonne controlled-atmosphere store for apples, with an ammonia plant whose waste heat warms the packing hall.
| Parameter | Value |
|---|---|
| Cooling capacity | 1,850 kW |
| Room temperature | −1 … +2 °C |
| Refrigerant | NH₃ |
Bandar Abbas · 2023 · Fisheries & seafood
Seafood blast-freezing line
Two blast tunnels and an IQF spiral that freeze the morning catch before noon, next to the fishing port.
| Parameter | Value |
|---|---|
| Throughput | 2,000 kg/h + 24 t/day |
| Air temperature | −42 °C |
| Refrigerant | NH₃ / CO₂ |

Tehran · 2025 · Pharmaceuticals & vaccines
Pharma distribution hub
A +2 to +8 °C warehouse with full plant redundancy, temperature mapping and alarm logs for GDP audits.
| Parameter | Value |
|---|---|
| Cooling capacity | 420 kW |
| Room temperature | +2 … +8 °C |
| Refrigerant | R449A |
How we work
Four stages, one team. The temperature drops as the project moves forward.
- +24°C
Survey & load calculation
We measure the site, the product and the duty cycle before sizing anything.
- +4°C
Engineering
P&IDs, 3D layout and equipment selection, reviewed with your team.
- −18°C
Build & commission
Our own crews build the steel hall, fit the panels, install and start up the plant.
- −40°C
Service & monitoring
Scheduled maintenance and 24/7 remote alarms for every site.
Let’s build your cold chain
Tell us what you store and how much of it. An engineer will call you back within one working day.