Skip to content
Bahman

Blast-freezer tunnel, project 0217

Location
Isfahan
Year
2022
Industry
Meat & poultry
Type
Blast freezer

The tunnel on the home page readout: 14.2 t of poultry from +24 to −40 °C every night.

Challenge

Double the freezing capacity inside the existing building, without stopping production.

Solution

Two high-velocity air coolers on a new pump-fed NH₃ circuit, installed over three weekends.

Result

Batch time down from 14 to 9 hours.

Products used

Next project

Urmia cold-storage complex